Technology and Engineering Atlas

How Things Are Built
Sign In
Text size
100%
Theme
Engineered System

Snowy Mountains Scheme

Civil Engineering

The Snowy Mountains Scheme, also known as the Snowy Hydro or the Snowy scheme, is a hydroelectricity and irrigation complex in south-east Australia, near the border of New South Wales and Victoria. It consists of sixteen major dams, nine power stations, two pumping stations, and 225 kilometers of tunnels, pipelines and aqueducts, constructed between 1949 and 1974 under the supervision of Chief Engineer Sir William Hudson. It is the largest engineering project ever undertaken in Australia. This description is adapted from Wikipedia contributors under CC BY-SA 4.0; changes were made. https://creativecommons.org/licenses/by-sa/4.0/

Facts
Year
1974 1
Significance
It is the largest engineering project undertaken in Australia. 1
Classification
Status
Operational 1
Sources
1. Snowy Mountains Scheme (Wikipedia)
  • Lead section, construction-dates sentence
    the scheme consists of sixteen major dams; nine power stations; two pumping stations; and 225 kilometres (140 mi) of tunnels, pipelines and aqueducts that were constructed between 1949 and 1974.
  • Lead section, superlative sentence
    It is the largest engineering project undertaken in Australia.
  • status sentence
    It is the largest engineering project ever undertaken in Australia.
  • In Group: Large Dams and Hydroelectric Schemes, Introduction
    The Snowy Mountains Scheme, also known as the Snowy Hydro or the Snowy scheme, is a hydroelectricity and irrigation complex in south-east Australia.
View the Source
Comments (0)
No comments yet. Be the first to share a thought.
Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.