This dimension places an engineered system in the year it was actually completed. Wikipedia notes Hoover Dam was "constructed between 1931 and 1936" and "turned over to the federal government on March 1, 1936, more than two years ahead of schedule." Browsing by year sets a system in the wider timeline of engineering history.
1983
Filter Results3 entries
Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.
Sign in to dispute this or suggest a correction.