Change management in engineering, also called change request management, is the process of requesting, judging, planning, carrying out and reviewing changes to a system so that every change can be traced. It runs through six activities: identify a potential change, analyze the change request, evaluate it, plan it, implement it, and review and close it, carried out by four roles and recorded in a change log. It is closely tied to change control and configuration management and is used in software development and in manufacturing, where a fault reported in a product leads to a costed and approved change. In process plants it is known as management of change and is a safety requirement, as the Flixborough explosion showed.
Connections
Associated With
Source Change management (engineering) (Wikipedia)
In Field
Source Change management (engineering) (Wikipedia)
Sources
Change management (engineering) (Wikipedia)
In Field: Systems Engineering, Lead
The change request management process in systems engineering is the process of requesting, determining attainability, planning, implementing, and evaluating of changes to a system.
Associated With: Configuration management, Introduction
There is considerable overlap and confusion between change request management, change control and configuration management.
In Group: Engineering Project and Change Management, Lead paragraph
The change request management process in systems engineering is the process of requesting, determining attainability, planning, implementing, and evaluating of changes to a system.
View the SourceReader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.
Sign in to dispute this or suggest a correction.