Technology and Engineering Atlas

How Things Are Built
Sign In
Text size
100%
Theme
Engineered System

Synchronous grid of Continental Europe

Electrical Engineering

The Continental Europe Synchronous Area, formerly known as the UCTE grid, is a synchronized electrical transmission network operating primarily across mainland Europe. Running as a single phase locked system at 50 hertz, it supplies electricity to more than 400 million customers across 32 countries, including most of the European Union, and ranks as the second largest synchronous electrical grid in the world.

Facts
Year
1997 1
Significance
In March 2022, weeks after Russia's invasion of Ukraine began, the grid's operators carried out an emergency synchronisation of the Ukrainian and Moldovan power networks to help sustain their electricity supply. 1
Classification
Status
Operational 1
FAQs

Was the Continental European grid connected to Ukraine and Moldova?

Yes. ENTSO-E synchronised with both networks on 16 March 2022.

Yes, on an emergency basis. On 16 March 2022, three weeks after the invasion of Ukraine began, ENTSO-E set up synchronisation with the networks of Ukraine and Moldova to provide external support for the power supply in those countries.
Sources
1. Synchronous grid of Continental Europe (Wikipedia)
Wikimedia Foundation
  • Lead section, grid scale description
    is the second largest synchronous electrical grid in the world, primarily operating in Europe.
  • Area section, Mediterranean interconnection date
    The grids of Morocco, Algeria and Tunisia (which part of North African Power Pool) have been synchronized with the European grid since August 1997 through the Gibraltar AC link and form the South West Mediterranean Block.
  • Area section, Ukraine and Moldova synchronisation
    On 16 March 2022, three weeks after the Putin regime had begun its invasion of Ukraine, the ENTSO-E set up synchronisation with the networks of Ukraine (Ukrenergo) and Moldova (Moldelectrica) on an emergency basis to provide external support for the power supply in those countries.
  • status sentence
    Running as a single phase locked system at 50 hertz, it supplies electricity to more than 400 million customers across 32 countries, including most of the European Union, and ranks as the second largest synchronous electrical grid in the world.
  • In Group: Continental and National Power Grids, Introduction
    The Continental Europe Synchronous Area (CESA), formerly known as the UCTE grid, is the second largest synchronous electrical grid in the world, primarily operating in Europe.
View the Source
Comments (0)
No comments yet. Be the first to share a thought.
Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.