The Central American Electrical Interconnection System, known by its Spanish acronym SIEPAC, links the power grids of six Central American nations: Panama, Costa Rica, Honduras, Nicaragua, El Salvador and Guatemala. First discussed in 1987, its new transmission lines were completed in 2014 and serve 37 million consumers, though the project has drawn controversy over its indirect environmental effects.
Facts
SignificanceConnects 37 million consumers in six Central American nations 1 FAQs
Which countries does the Central American Electrical Interconnection System connect?
It connects the power grids of Panama, Costa Rica, Honduras, Nicaragua, El Salvador and Guatemala.
SIEPAC links the power grids of six Central American nations: Panama, Costa Rica, Honduras, Nicaragua, El Salvador and Guatemala. Its constructed transmission lines connect 37 million consumers across those six countries.
Sources
1. SIEPAC
Intro, sentence 4
was completed in 2014
Intro, sentence 3
The constructed new transmission lines connect 37 million consumers in Panama, Costa Rica, Honduras, Nicaragua, El Salvador, and Guatemala.
status sentence
First discussed in 1987, its new transmission lines were completed in 2014 and serve 37 million consumers, though the project has drawn controversy over its indirect environmental effects.
In Group: Regional Power Pools and Electricity Markets, Introduction
SIEPAC (Central American Electrical Interconnection System, Spanish: Sistema de Interconexión Eléctrica de los Países de América Central) is an interconnection of the power grids of six Central American nations.