Technology and Engineering Atlas

How Things Are Built
Sign In
Text size
100%
Theme
Invention

PERT Chart

Industrial Engineering

A PERT chart, named for the Program Evaluation and Review Technique, is a project-scheduling diagram that models a project as a network of tasks and their dependencies, used to estimate the shortest possible completion time and to identify the critical path, the sequence of tasks that directly determines the project's overall duration. The United States Navy's Special Projects Office developed PERT in 1957 and 1958, working with the consulting firm Booz Allen Hamilton and the Lockheed Corporation, to plan and coordinate the many interdependent contractors building the Polaris submarine-launched ballistic missile program. PERT differed from the similar, independently developed critical path method by explicitly allowing optimistic, pessimistic and most-likely time estimates for each task, and both techniques became standard tools of industrial project planning.

Facts
Year
1958 1
Significance
Developed for the US Navy Polaris missile project and adopted throughout industry 1
Connections

In Field

Source Program evaluation and review technique, Wikipedia
Sources
1. Program evaluation and review technique, Wikipedia
  • History
    PERT was developed by the United States Navy Special Projects Office, Lockheed Aircraft, and Booz Allen Hamilton to support the Navy's Polaris missile project.
  • Wikipedia 'Program evaluation and review technique': PERT introduced 1958 for US Navy by Booz Allen Hamilton, checked 2026-09-27
  • In Field: Industrial Engineering, Categories
    Engineering management
View the Source
Comments (0)
No comments yet. Be the first to share a thought.
Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.