A PERT chart, named for the Program Evaluation and Review Technique, is a project-scheduling diagram that models a project as a network of tasks and their dependencies, used to estimate the shortest possible completion time and to identify the critical path, the sequence of tasks that directly determines the project's overall duration. The United States Navy's Special Projects Office developed PERT in 1957 and 1958, working with the consulting firm Booz Allen Hamilton and the Lockheed Corporation, to plan and coordinate the many interdependent contractors building the Polaris submarine-launched ballistic missile program. PERT differed from the similar, independently developed critical path method by explicitly allowing optimistic, pessimistic and most-likely time estimates for each task, and both techniques became standard tools of industrial project planning.
Facts
SignificanceDeveloped for the US Navy Polaris missile project and adopted throughout industry 1 Connections
In Field
Source Program evaluation and review technique, Wikipedia
Sources
1. Program evaluation and review technique, Wikipedia
History
PERT was developed by the United States Navy Special Projects Office, Lockheed Aircraft, and Booz Allen Hamilton to support the Navy's Polaris missile project.
- Wikipedia 'Program evaluation and review technique': PERT introduced 1958 for US Navy by Booz Allen Hamilton, checked 2026-09-27
In Field: Industrial Engineering, Categories
Engineering management
View the SourceReader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.
Sign in to dispute this or suggest a correction.