The Trans-Alaska Pipeline System is an 800-mile, 48-inch diameter oil pipeline that carries crude oil from Prudhoe Bay on Alaska's North Slope south to the port of Valdez. The system also includes the Valdez Marine Terminal and eleven pump stations along its route. It was commissioned in 1977, with oil first flowing through the line on June 20 of that year. At its designed maximum the pipeline can move over two million barrels of oil per day, though throughput has fallen well below that capacity as North Slope production has declined.
Facts
SignificanceThe Trans-Alaska Pipeline System is one of the largest pipeline systems in the world, carrying crude oil about 800 miles from Prudhoe Bay on Alaska's North Slope south to the Valdez Marine Terminal. 1 Connections
Associated With
Crude oil pipeline system
Sources
1. Trans-Alaska Pipeline System (Wikipedia)
Wikipedia contributors, Wikimedia Foundationlead section, para 2 (first oil flow)
The first barrel of oil traveled through the pipeline in the summer of 1977, with full-scale production by the end of the year.
lead section, para 2 (world's-largest claim)
TAPS is one of the world's largest pipeline systems.
status sentence
At its designed maximum the pipeline can move over two million barrels of oil per day, though throughput has fallen well below that capacity as North Slope production has declined.